Past Projects
Design & Construct: New build: South West Rocks Fire Station
Client: Fire and Rescue NSW
Status: Completed
Contract: D&C
Consultants: Leffler Simes Architects
Construction of the new ‘retained’ [on-call firefighters] Fire Station included all ground works, yard drill areas and the light build, structural steel frame to accommodate appliance and equipment storage, watch room and training spaces and male/female locker rooms. Installation of the 20m+ training tower required deft manoeuvring of the pile driver and pole-bearing crane prior to site completion which included landscaping.