Extensive safety scaffolding and guard railing were part of the risk mitigation design by Royal Contractors who were engaged to renew roofing at Sir Eric Woodward School. The project entailed the removal of existing concrete roof tiles, strengthening of the existing roof purlin structure, installation of new safety fall arrest mesh, installation of heavy-duty insulation, Colorbond steel roofing and the installation of a new roof safety system.
Project Challenges include:
- Live Site Project
- Limited access to premises and site surrounds
- Structural strengthening of existing roof purlins within a sharp roof pitch
- Complete building perimeter stormwater upgrades