Vaucluse Public School Lift Accessibility Works
Client: Soil Conservation Service NSW
Status: Completed
Contract: MW21
Consultant: Project Techniques Pty Ltd
Construction of new lift shaft, electrical upgrade. Installation of new passenger lift. Live site environment, buildings all in continuous use during construction.
Lift pit integration into the existing site space. Significant challenges with material delivery to central site location within school, live site operation and integration into existing building fabric.
Lift pit integration into the existing site space. Significant challenges with material delivery to central site location within school, live site operation and integration into existing building fabric.