Past Projects
Refurbish: New Science Laboratories at Baulkham Hills High School
Client: School Infrastructure NSW – Special Projects
Status: Completed
Contract: MW21
Consultants: Gran Associates Architects
Completion: May 2019
Safety and adaptability underpinned the requirements for Royal Contractors’ extensive refurbishment to modernise the School’s science laboratories and preparation rooms.
All base services were renewed with an emphasis on acid resistance through the usage of fusion welded HDPE thermoplastic services, new fume cabinets, extraction systems, emergency eye wash bays, an emergency shower bay and the inclusion of modern AV and presentation systems with 120 inch wireless display.
Height adjustable joinery ensures universal access whilst acoustic ceilings, acid resistance XR grade benchtops, and safety vinyl flooring were installed to commercial laboratory specification. Adjacent preparation rooms were refurbished to incorporate significant storage solutions, acid bays, chemical cabinets and preparation benchtops.
Project Challenges include:
- Live Site Project
- Limited access to premises and site surrounds
- New base build services
- HDPE fusion welded services
- Diversion of ground floor services