New Build Construction
Hornsby Girls High School Orchestral Hall
Client: School Infrastructure NSW – Northern
Status: Completed
Contract: MW21
Consultants: Crawford Architects
A harmonious symphony of craftsmanship and innovation, the new orchestral hall stands as a testament to meticulous design and execution. Within its walls, a crescendo of functionality unfolds, featuring storage spaces, an IT room, and inviting breakout areas, all gracefully laid upon sprung timber flooring. The exterior showcases a unique cladding, while accessibility is ensured with thoughtfully integrated disability ramps. An acoustic cloud ceiling and discreet operable partition wall elevate the auditory experience, while beneath the surface, new electrical and IT services seamlessly integrate with upgraded civil and stormwater infrastructure. The embodiment of form and function, a hot dip galvanized portal frame provides both strength and aesthetic appeal to this architectural masterpiece.