Past Projects
Construct: Roof Replacement at Muirfield High School
Client: Spotless & School Infrastructure NSW – Northern
Status: Completed
Contract: MW21
Completion: May 2020
Extensive safety scaffolding and guard railing were part of the risk mitigation design by Royal Contractors who were engaged to renew roofing at Muirfield High School. The project entailed the removal of existing concrete roof tiles, strengthening of the existing roof purlin structure, installation of new safety fall arrest mesh, installation of heavy-duty insulation, Colorbond steel roofing and the installation of a new roof safety system.
Project Challenges include:
- Live Site Project
- Limited access to premises and site surrounds
- Structural strengthening of existing roof purlins
- Complete building perimeter stormwater upgrades